Factory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW Generator

Product Details
Customization: Available
After-sales Service: 1 Year Free Service and Life-Time Service
Warranty: 1 Year
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
100000000 RMB
Plant Area
13380 square meters
  • Factory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW Generator
  • Factory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW Generator
  • Factory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW Generator
  • Factory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW Generator
  • Factory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW Generator
  • Factory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW Generator
Find Similar Products

Basic Info.

Model NO.
YDN-GF-1500
Gas Source
Gas
Certification
CE, ISO
Power
>200kW
Standard
Standard
Engine Brand
FAW
Rated Voltage
220/380V
Engine Speed
1500/1800rpm
Frequency
50/60Hz
Certificate
CE ISO Saso
Alternator
Ydn Power
Starting Method
Electric Start
Working Condition
1000kw for 24 Hours
Transport Package
for Open Type, Packing with Plywood Case; for Sile
Specification
Gas generator
Trademark
YDNPOWER
Origin
Weifang China
HS Code
8502204000
Production Capacity
500 Sets /Month

Product Description

 1200KW parallel operation of FAW natural gas generator
Model YDN-GF-1500
Rated power (kW/KVA) 250/312.5
Rated current (A) 450
container type Size (mm) 6000*2500*2750
Weight (kg) 6500
Engine Model FAW CA6SM3
Type Water-cooled, 4-stroke,6 cylinder in-line
Rated Power(kW/KVA) 290
Rated Speed(rpm) 1500
Cylinder No. 6
Bore*Stroke(mm) 126.5×166
Cooling Method Water-cooled
Oil Consumption(g/KWH) 1
Oil Capacity(L) 35
Cooling Water Capacity(L) 110
Gas Consumption(kWh/m3) ≤0.33
Starting method 24V DC
Alternator Brand Farrand
Model FLD250
Rated Power(kW/KVA) 250/312.5
Efficiency 92.5%
Voltage Regulation <=±1
Excitation mode Brushless, Self Excitation
Insulation Class H
Control 
System
Model SMARTGEN HGM6110N
Working Voltage DC8.0V to DC35.0V
Overall Dimensions 197 mm x 152 mm x 47mm
Panel Cutout 186mm x 141mm
Working Condition Temperature: (-25~70)ºC; Humidity: (20~90)%
Weight 0.56kg
Special notes:
The definition of generator power is as follows:
Rated Power (PRP):
1. The running time is unlimited every year.
2. In a 250 hours continuous period, the average load rate should not exceed 70% .

The paralleling 1MW power station plan please contact us
Factory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW GeneratorFactory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW GeneratorFactory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW Generator

Requirements for natural gas:

  1.  The methane content should not be lower than 95%.
  2.  The gas temperature should be between 0-40 ºC.
  3.  No impurity should be in the gas. Water in the gas should be less than 20g/Nm3.
  4.  Heat value should be at least 8500kcal/m3, if less than this value, the power of the engine will be declined.
  5.  Gas pressure should be 3-100KPa, if the pressure is less than 3KPa, booster fan is necessaryand pressure relief device should be added if the value is higher than 100KPA;  
  6.  The gas should be dehydrated and desulfurized. Make sure that there is no liquid in the gas. H2S<200mg/Nm3.
Factory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW GeneratorFactory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW GeneratorFactory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW GeneratorFactory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW GeneratorFactory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW Generator

Factory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW GeneratorFactory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW GeneratorFactory OEM Drilling Platform Main Power Supply Runs in Parallel with 1200kw FAW Generator

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now