1200KW parallel operation of FAW natural gas generator
Model |
YDN-GF-1500 |
Rated power (kW/KVA) |
250/312.5 |
Rated current (A) |
450 |
container type Size (mm) |
6000*2500*2750 |
Weight (kg) |
6500 |
Engine |
Model |
FAW CA6SM3 |
Type |
Water-cooled, 4-stroke,6 cylinder in-line |
Rated Power(kW/KVA) |
290 |
Rated Speed(rpm) |
1500 |
Cylinder No. |
6 |
Bore*Stroke(mm) |
126.5×166 |
Cooling Method |
Water-cooled |
Oil Consumption(g/KWH) |
1 |
Oil Capacity(L) |
35 |
Cooling Water Capacity(L) |
110 |
Gas Consumption(kWh/m3) |
≤0.33 |
Starting method |
24V DC |
Alternator |
Brand |
Farrand |
Model |
FLD250 |
Rated Power(kW/KVA) |
250/312.5 |
Efficiency |
92.5% |
Voltage Regulation |
<=±1 |
Excitation mode |
Brushless, Self Excitation |
Insulation Class |
H |
Control System |
Model |
SMARTGEN HGM6110N |
Working Voltage |
DC8.0V to DC35.0V |
Overall Dimensions |
197 mm x 152 mm x 47mm |
Panel Cutout |
186mm x 141mm |
Working Condition |
Temperature: (-25~70)ºC; Humidity: (20~90)% |
Weight |
0.56kg |
Special notes: The definition of generator power is as follows: Rated Power (PRP): 1. The running time is unlimited every year. 2. In a 250 hours continuous period, the average load rate should not exceed 70% . |
The paralleling 1MW power station plan please contact us
Requirements for natural gas:
- The methane content should not be lower than 95%.
- The gas temperature should be between 0-40 ºC.
- No impurity should be in the gas. Water in the gas should be less than 20g/Nm3.
- Heat value should be at least 8500kcal/m3, if less than this value, the power of the engine will be declined.
- Gas pressure should be 3-100KPa, if the pressure is less than 3KPa, booster fan is necessary, and pressure relief device should be added if the value is higher than 100KPA;
- The gas should be dehydrated and desulfurized. Make sure that there is no liquid in the gas. H2S<200mg/Nm3.
FAQ
Q1: Are you a trading company or a manufacturer?
Answer: We are a factory
Q2: What is your power range of your diesel generator?
A: We can provide 10KW-1500KW diesel generator and comprehensive power supply solutions for you
Q3: What is the delivery time?
A: 4-6 weeks
Q4: What is your minimum order quantity(MOQ)?
A: 1 set.
Q3: What are your terms of payment?
Answer: 30% by TT in advance and 70% balance before shipment.
Q4: What is your warranty period?
A: Our warranty period is 1 year or 1000 hours, whichever comes first. But according to some special items, we can extend the warranty period.
Q5: Do you provide OEM services?
A: Yes.
Q6: How can I trust you?
A: If you are not satisfied with the pictures, videos, boarding reports, load tests, customer experience and sales staff's understanding of the generators you are interested in, we invite you to visit our spacious storage yards and stores to witness your generators. Carry out a load test and check our professional operations here.
Q7: What should I do after I receive the generator set?
Answer: Please read the operation manual carefully after obtaining the generator.
The generator is attached with the user manual. With Operation, Installation, Maintenance and Repair Guid